Short answer
A booking form is the shipper's written instruction to book space. The forwarder supplies the blank form; the shipper fills in the cargo, the parties and the payment terms, stamps it and sends it back. From that moment the forwarder can request space from a carrier, quote local charges against a signed document, and later build the shipping instruction and the bill of lading from the same data.
Nothing sails until this page is complete. Missing product detail, a consignee without a street address, or a payment box left blank will send the forwarder back to you — and that round trip usually costs a sailing.
"Booking" means two different pieces of paper
In daily use, booking refers either to the form the shipper sends the forwarder, or to the confirmation the carrier sends back after space is released. Both are called booking, and mixing them up causes real problems at the booking desk.
| Document | English name | Issued by | What it does | Timing |
|---|---|---|---|---|
| Booking form (booking note, shipping order) | Booking Form / Booking Note / Shipping Order | Shipper fills it; forwarder supplies the template | An instruction: how this cargo should move | Before booking |
| Booking confirmation (space confirmation) | Booking Confirmation | Carrier or its agent | Proof that space exists: what the carrier accepted, and how much | After booking |
The form at the bottom of this page is the shipper's side of that pair. It is the starting point of the whole chain: the forwarder books from it, schedules trucking and customs from it, builds the shipping instruction and the B/L from it, and prices ocean freight and origin charges from it.
The sheet is printed as a SHIPPING ORDER for a reason. Years ago a forwarder copied the shipper's requirements onto a one-page shipping instruction and handed it to the carrier, who accepted space on that basis. The wording stayed. Today S/O in port talk usually means the release note the carrier gives the depot, so when someone says "send me the S/O", ask which one they mean.
Keep three jobs apart: the booking form decides whether space is confirmed, the release note decides where the container is picked up, and the bill of lading decides who owns the cargo. The data must match across all three, but no one document replaces another.
Six steps from quote to sailing
1. Quote
You send product, weight, volume, origin and destination ports, and roughly which container you need. We return a rate and a few sailing options.
2. Fill the form
Once the rate and sailing are accepted, you complete the booking form, stamp it, and send it back. How clean this step is sets the pace for the rest of the shipment.
3. Booking request
The forwarder files with the shipping line, airline or rail platform and receives a confirmation with a booking number.
4. Pick up and load
The release note names the depot and container number. An empty box is collected, taken to the factory, loaded, and returned or delivered to the terminal.
5. Cut-off and customs
Shipping instructions go in before the SI cut-off; export declaration runs in parallel, and the release message has to reach the terminal system.
6. Sailing and B/L
The terminal receives the container, the vessel sails, and the bill of lading is issued from the shipping instructions.
Errors surface in steps four to six. The wrong container type books the wrong equipment, and light cargo will not fill a small box. One wrong letter in the consignee means an amendment. Understated weight upsets both stowage and road limits. Swapped Incoterms and payment terms end in an argument about whether the B/L may be released.
Who fills it, when it is due, who receives it, why it exists
Forwarder gives the template, shipper supplies the content
Product name, packages, gross weight and volume, consignee and notify party, delivery instructions — only the shipper knows these. A factory, trading company or its agent fills them in and stamps the bottom right corner.
Before the booking request goes out
FCL: 7–14 days before sailing, 3–4 weeks in peak season. LCL: 5–7 days. Air: 2–3 days before departure. Rail: 10–15 days. Dangerous goods, overweight, reefer and special equipment need more lead time for approval.
The forwarder's booking and operations desk
One window for the carrier. Shippers do not book directly with the line, and on LCL, DDP or duty-included lanes the forwarder is the only counterpart. Additions, amendments and cancellations go through the same desk.
It is the basis for everything downstream
Space request, charge settlement, source data for later documents, the record of who accepted which terms, and the file copy when a dispute appears. Without it, nothing can be filed and nothing can be traced back to a specific field.
The four answers on one timeline
| Stage | Who provides | When | To whom | Why |
|---|---|---|---|---|
| Blank form | Forwarder sales or customer service | After the quote is accepted, before booking | Shipper, factory, trading agent | Standard fields, fewer follow-up questions |
| Completed, stamped form | Shipper, factory, trading agent | 7–14 days before sailing (3–4 weeks in peak) | Forwarder booking and operations | Basis for the space request and for billing |
| Booking request | Forwarder | Within one working day of receipt | Line, airline or rail platform | Reserve space and equipment, fix the rate |
| Booking confirmation | Carrier | 1–3 working days after filing | Forwarder, then the shipper | Vessel, voyage, equipment, cut-off times |
| Release note (S/O) | Carrier or its agent | After space release, before pick-up | Forwarder, depot, trucker | Names the depot and container; authorises pick-up |
| Shipping instructions (SI) | Shipper | Before the SI cut-off, usually 2–4 days before sailing | Forwarder, then the carrier | Manifest and B/L data |
| Draft bill of lading | Forwarder | Around sailing, before originals are issued | Shipper for confirmation | Catch errors before the B/L exists |
Field by field
Following the layout of the actual sheet, the page divides into eight blocks.
1. Header and document number
| Field | English | What to write | If it is wrong |
|---|---|---|---|
| Addressee | To | Pre-printed with the forwarder's full name; leave as is | Sent to a company that is not acting for you, and the instruction is void |
| Document title | SHIPPING ORDER | Pre-printed | — |
| Booking date | Booking Date | The date you send it, not the expected sailing date | Sailing match and peak-season queueing get misjudged |
| Booking number | Shipping Order No. | The forwarder numbers it on receipt; leave blank | Without a number, reconciliation and tracing get slow |
| SI mailbox | B/L Data | Pre-printed address for shipping instructions | Sent to a personal mailbox and buried at cut-off |
Leave the booking number empty. The forwarder assigns it on receipt; a number you invent creates a duplicate. The SI mailbox is a separate channel from day-to-day correspondence — during cut-off week, documents go there and nowhere else.
2. The three parties
| Field | English | What to write |
|---|---|---|
| Shipper * | Shipper | Full legal name in Chinese and English, address, phone, contact. Must match the export declaration's operating unit and the invoice header, or VAT refund and payment collection are affected |
| Consignee * | Consignee | Full legal name in both languages, complete street address, phone, contact, tax ID — destination customs usually asks for it |
| Notify party * | Notify Party | Normally the buyer or their broker at destination, with address and phone. Under a letter of credit, copy the L/C wording exactly |
| Forwarding agent * | Forwarding Agent | The party actually instructing the forwarder — often a trading agent, not the same company as the shipper |
| Contact, fax, email, phone | Contact / Fax / Email / Tel | Someone who can be reached during the week, not the switchboard |
This block causes the most rework. A consignee with no street number may be undeliverable. "Same as consignee" is rejected for the notify party in parts of the Middle East and South America. Under an L/C, one wrong letter and the bank calls it a discrepancy.
3. The route: four locations that are not interchangeable
| Field | English | Note |
|---|---|---|
| Pre-carriage | Pre-carriage by | How cargo reaches the loading port — truck, barge, rail. Fill it for multimodal moves |
| Place of receipt * | Place of Receipt | Where the carrier actually takes the cargo — a factory or inland depot, not necessarily the port |
| Vessel and voyage * | Intended Vessel / Voy. No. | Name the vessel if you have a sailing; otherwise write "earliest available, forwarder's option" |
| Port of loading * | Port of Loading (POL) | Must match the customs port. From Shenzhen that is usually Yantian, Shekou or Dachan Bay; Nansha and Hong Kong also come up |
| Port of discharge * | Port of Discharge (POD) | Match the sales contract. Different ports in the same country can differ sharply on inland cost |
| Place of delivery * | Place of Delivery | Where the carrier hands over — the buyer's warehouse on door terms |
| Final destination | Final Destination | The inland end point, used to decide whether transit customs is needed |
| B/L pick-up | B/L Pick-up at | Where originals are collected; it decides the release route and whether telex release is possible |
Name all four: place of receipt, port of loading, port of discharge, place of delivery. Write only "Shanghai to Hamburg" and, on a door-to-door or multimodal move, the inland legs at both ends lose their owner — and their price.
4. Equipment and cargo description
| Field | English | What to write |
|---|---|---|
| Full container | FCL | Tick it and count 20GP, 40GP, 40HQ, 45GP. Open-top, flat rack and tank go under Others |
| Less than container | LCL | Tick it and give pieces, dimensions per piece, gross weight, volume, whether palletised and whether stackable |
| Packages | No. of Package | Number plus unit — 120 CTNS, 18 PLTS, 6 CRATES. Never a bare number |
| Marks | Marks & Numbers | What is actually printed on the cartons; N/M if there are none |
| Description | Description of Goods | Specific product, material, function. Not "accessories", "general cargo" or "gifts" |
| Weight and volume | Gross Weight (KGS) / Measurement (CBM) | Totals for the shipment, close to the packed figures. Large gaps disturb stowage and weight limits |
The description earns its space. Carriers use it to decide whether to accept the booking, which rate applies, and whether extra declarations are needed. "Machine parts" invites a request for material and function. "Chemicals" goes straight into dangerous goods review. "Gifts" almost guarantees an inspection at destination.
5. Two ticks: trucking and customs
| Field | English | How to fill | What it means |
|---|---|---|---|
| Trucking | Transport / Trucking | Tick self-arranged or forwarder-arranged | Self-arranged: you provide the truck, and the forwarder carries no liability for late or wasted trips. Forwarder-arranged: give the pick-up date, address and contact |
| Pick-up date | Pick-up Date | A real date, not "ASAP" | Trucks are dispatched against it; a wasted trip is still billed |
| Customs | Customs Declaration | Tick forwarder-broker or self-declared | Self-declared: you file, and the forwarder carries no liability for rejected or late releases |
| Transit | Transit | Name the transit port and method | Required for inland declaration with port transit, or the truck cannot leave the gate |
| Original B/L | Original B/L Required | Tick if originals are needed, and how many | Sets the release method: originals by courier, telex release or sea waybill |
These two ticks look like boilerplate and are actually where liability sits. Tick self-arranged and miss the cut-off, and the exposure is yours. Tick forwarder-arranged and move the pick-up date at short notice, and the wasted trip and rescheduling fee are still yours. Clear ticks save the argument later.
6. Freight and origin charges
| Field | English | How to fill |
|---|---|---|
| Ocean freight | Freight Prepaid / Collect | Prepaid (B/L released after payment) or collect; it must agree with the Incoterm |
| Origin charges | Local Charges Prepaid / Collect | Who pays trucking, customs, terminal and documentation at origin |
| Invoice header (RMB) | Invoice Title (RMB) | Company name, tax ID and payment location for a RMB VAT invoice — domestic factories and fellow forwarders |
| Invoice header (USD) | Invoice Title (USD) | Company name and payment location for a USD commercial invoice — offshore or overseas entities |
| Signature and stamp | Stamp / Signature | Shipper or agent seals and signs, accepting the rates, charges and terms on the sheet |
"Prepaid — B/L after payment" is not a note, it is a link between money and release. Tick prepaid and charges must clear before the B/L leaves. Tick collect and the consignee pays at destination, but if they refuse, the carrier comes back to the shipper. Unclear payment boxes produce arguments about who pays, not about price.
7. What the form has no box for
Put these in the remarks or in the covering email. Omit one and the booking comes back.
- Dangerous goods — UN number, class, packing group, MSDS, packaging certificate. Declare 7–10 days ahead; some carriers also want destination approval.
- Overweight or oversize — gross weight per container, dimensions per piece. Above the carrier or road limit, apply in advance and expect a surcharge.
- Reefer and temperature control — set point, ventilation, power supply, pre-cooling.
- Batteries and powered devices — chemistry, watt-hours, contained in or packed with the goods, transport test report if required.
- Brands and IP — whether authorisation exists; destination customs may detain the cargo.
8. Amendments and the file copy
Once sent, the form is not frozen. A different vessel, an extra container, a new consignee or a cancellation has to go back onto the same document and produce a version. The reason is practical: when a container rolls, demurrage starts, or a charge is disputed, you can show what was instructed, who confirmed it, and which revision applied.
How the signed form gets to us
Three routes are in daily use. Which one you pick depends on what the receiving desk needs and how much time is left.
| Route | How it is done | When to use it | Watch out for |
|---|---|---|---|
| Print, stamp, scan, send from the company mailbox | Print the form, apply the company seal (or the bilingual business seal), scan every page to PDF, and email it to your named booking contact or the SI mailbox. Subject line: booking form + destination + ETA of sailing; file name with your company abbreviation and the date | Standard bookings. Any case that needs a record, a file copy, or a document the carrier may look at | Seal and figures must be legible. Skewed phone photos with glare or a missing page will be sent back |
| WeChat to the booking desk | Send the scan or a sharp photo straight to the person handling your booking, with one line on the sailing you need | Time pressure, questions that need answering on the spot, counterpart online | Images are compressed and digits blur. Follow up with the email version; do not leave the only copy in a chat thread |
| QQ to the nominated forwarder | Send the file over QQ to the operator or customer service desk; multi-page forms and document sets travel well as files | The desk works on QQ, or several attachments go at once | Send files rather than screenshots, and keep the transfer record for reconciliation |
The three can be stacked: a WeChat heads-up, the email with the formal copy, QQ for extra attachments. But the formal copy has to land in the mailbox or the desk's designated intake — chat is for chasing, not for the record.
Peak season, unconfirmed data, several suppliers
The form is built for the standard case. In a tight market, before loading, or with cargo split across factories, filling every box to the last digit works against you. Three habits that work, all of them starting with telling your forwarder.
Peak season: file with several carriers, keep the form coarse
Space is not guaranteed by filing. Sending the same shipment to two or three lines or airlines and taking whichever releases first is normal practice. The form need not be finished: leave the vessel blank or write "carrier's option", name the product at category level, give ranges for packages, weight and volume. Hold the space first, then send the exact figures to whoever confirmed.
Data not final: ranges now, exact figures at SI stage
Before the container is packed, pieces, gross weight, volume and even specifications can still move. Put estimates and a category-level description on the form, then, after packing and weighing, send the exact figures in the shipping instructions. The forwarder updates the manifest and the draft B/L. Space is held early, data is fixed late, and neither side of the chain is held up.
Several suppliers on one shipment: the shipper on the B/L need not be you
When a shipment is assembled from several factories, your own cargo is a small share, and the buyer wants a single shipper on the B/L, the usual arrangement is this: your company still issues the booking form as the instructing party, named in the forwarder block; the shipper field on the B/L, after agreeing with the buyer, names the main supplier or a third party the buyer nominates. The B/L then reads as one supplier's shipment while the cargo is consolidated from several.
Booking form, confirmation, release note, SI, B/L
| Document | English | Issued by | Timing | Purpose |
|---|---|---|---|---|
| Booking form | Booking Form / S/O | Shipper fills, forwarder accepts | Before booking | Instruct transport, request space, agree charges |
| Booking confirmation | Booking Confirmation | Carrier | After booking | Confirm space, vessel, cut-off times |
| Release note | S/O, Shipping Order | Carrier or agent | Before pick-up | Release the box, name the depot and container |
| Shipping instructions | SI | Shipper | Before SI cut-off | Manifest and B/L content |
| Bill of lading | B/L | Carrier | After loading | Receipt, contract of carriage, document of title |
The data travels: consignee, description, packages and weight move from the booking form into the SI and onto the B/L. Change one and the downstream documents follow, or the set is inconsistent.
Where booking forms go wrong
- Vague description — "accessories", "general cargo", "samples". The carrier cannot rate or accept it; name the product, material and function.
- Incomplete consignee — no street number, postal code, phone or tax ID. Undeliverable and unclearable.
- Bare package counts — 120 cartons or 120 pallets? Stowage and receiving depend on the unit.
- Estimated weight and volume — LCL is re-invoiced at destination; overweight FCL is refused.
- Wrong equipment — light cargo in a 40GP instead of a 40HQ wastes half the box; heavy cargo in a small box goes over weight.
- Incoterm against payment terms — CIF with collect, FOB with prepaid. The settlement argument is guaranteed.
- Abbreviated invoice header — no invoice, no booking entry, and finance returns the payment.
- Unticked trucking or customs — liability stays undefined until something goes wrong.
- Undeclared special cargo — dangerous, powered or reefer cargo held at the terminal or refused by the carrier.
- No stamp, no signature — an unsigned form is weak evidence that an instruction was ever accepted.
Take the form
The booking form covers ocean FCL and LCL, air freight and rail. The header is pre-printed with the forwarder's address and the shipping-instruction mailbox. Fill every starred field, tick the service options, seal it, and send it back.
File format: Excel 97-2003 workbook (.xls), one sheet, "shipping order form".
Download
Questions about a field? Send the invoice draft and packing list; we will mark up the form and send it back.
Questions we get asked
Which document is "the booking"?
Depends on the speaker. The form the shipper sends is a booking; the confirmation the carrier returns is also a booking. One is the instruction, the other proves space exists. They are not interchangeable.
Who supplies the form?
The forwarder supplies the blank template; the shipper supplies the content. A factory, trading company or agent completes it, seals it, and returns it. Only the shipper knows the real product, packages, weight, volume, consignee and delivery needs.
When is it due?
After the rate is accepted and the cargo availability is roughly known, before the booking request goes out: 7–14 days before sailing for FCL, 3–4 weeks in peak season. Dangerous goods, overweight and reefer cargo need longer for approvals.
Who receives it?
Your forwarder's booking and operations desk, which files with the carrier. Shippers do not book directly with the line; on LCL, DDP and duty-included lanes the forwarder is the only window.
Is a WeChat message enough?
It travels, but it is compressed, easily lost, and buried in a thread. The formal copy belongs in the mailbox or the desk's intake. Keep the sealed original scan yourself.
Can the B/L consignee differ from the form?
Not casually. The B/L is built from the form, and changing the consignee after space is released is an amendment that the carrier must accept, usually at a charge. Under a letter of credit the wording must match exactly.
What do "self-arranged trucking" and "self-declared customs" mean?
You provide the truck and you file the export declaration. Ticking them shifts responsibility for late pick-ups and rejected declarations to you. It is a liability clause, not a disclaimer.
Can the form be changed after sending?
Before space is released, usually at no cost. After release, changing vessel, equipment or consignee is an amendment and may be charged. Once the box is picked up, a different equipment type means returning it first. Changes to manifest data after the SI cut-off can also cost money and lose the sailing.
How is LCL different?
FCL needs equipment type, quantity and the pick-up depot. LCL is rated on the greater of weight or measure, so dimensions per piece, stackability and palletisation matter — the consolidator sequences the container from them. Both need a precise description and marks.
Is the booking form the same as the SI?
No. The booking form secures space; the shipping instruction, filed before the SI cut-off, decides what the B/L says. Data must agree, purpose and timing do not.
In peak season, how complete does the form have to be?
Coarse is fine: vessel blank or "carrier's option", product at category level, ranges for packages, weight and volume. Take whichever carrier releases first, then send exact figures, and cancel the rest — watch the cancellation and dead-freight fees.
Can someone else appear as shipper on the B/L?
When one shipment is consolidated from several suppliers and the buyer wants a single shipper, the main supplier or a nominated third party can be named, with the buyer's agreement, while your company remains the instructing party on the form. The export declaration still names the actual exporter, so expect questions if the B/L and declaration diverge, and check any destination rule requiring the B/L to match the invoice and certificate of origin.

