Since 2012 NVOCC GD20230925153335 24h Response
+86 13392162503 sales8015@goodhopefreight.com Login
Goodhope Freight
  1. Home
  2. Canton Fair
  3. Buyer Guides
  4. MOQ, Deposit and Payment Terms: What to Settle Before You Leave Guangzhou

Negotiation

MOQ, Deposit and Payment Terms: What to Settle Before You Leave Guangzhou

The ten minutes after a supplier quotes a price decide more about your margin than the two hours before it. What follows is the short list of things that have to be written down before you get on the plane.

October 27, 2026

Typical deposit30% T/T, balance before or on shipment
MOQUsually per colour or per model, not per order
Price ladder4 to 6 tiers between trial and container volume
Usable PISpec, packing, HS code, term, date, inspection
Buyers and exhibitors shaking hands at a Canton Fair booth
The last ten minutes. A price agreed at a booth is a starting position. What turns it into an order is the MOQ per colour, the price ladder, the deposit structure, and a proforma invoice a customs officer can read without calling anyone.

MOQ: What It Actually Covers

"Our MOQ is 500" sounds like one number. It is usually three, and the difference decides whether a trial order is possible.

  • Per model. 500 pieces of one design. The strictest reading, and the one that most often blocks a first order.
  • Per colour or per size. 500 pieces total, but 200 minimum in each colourway. Common in textiles and footwear, where a dye lot or a tooling change drives the cost.
  • Per order, mixed. 500 pieces across four designs. The most useful reading for a buyer testing a range, and the one worth asking for explicitly.

There is also the gap between a sample MOQ and a production MOQ. Many factories will run 50 or 100 pieces as a trial at a higher unit price, on the understanding that the next order is larger. That is a real option and it is rarely offered unless asked.

The question that unlocks it: "What is the smallest order you would run at a price that still works for you, and what would the next order have to be?" Suppliers answer that question honestly, because it is about their production planning rather than about your budget.

Price Is a Curve, Not a Number

A quotation of 2.40 per unit means nothing without the quantity attached. Most consumer goods carry four to six price tiers between trial volume and container volume, and the curve is steepest at the bottom: the step from 100 to 500 units is usually larger than the step from 5,000 to 20,000.

Ask for the ladder in writing, with the break points. Then compare suppliers on the same break point rather than on the number they chose to quote. A supplier quoting the 5,000-piece price against a competitor's 500-piece price is not cheaper; they are answering a different question.

Two costs sit behind the ladder and are worth naming at the booth, because they are where the ladder actually comes from. Packaging, which is often quoted separately and can move the unit price by several percent. And tooling or mould cost, which is a one-off that gets amortised across the order — ask whether it is charged once, whether it is refundable against volume, and who owns the mould. Ownership matters the day you want to move to a second supplier.

Deposit, Balance and the Structures in Between

Thirty percent deposit with the balance against a copy of the bill of lading is the ordinary structure in Chinese manufacturing, and it is a fair one: the factory funds materials, the buyer funds the rest when the goods are demonstrably on a vessel.

StructureWho it protectsWhen it makes sense
30% deposit / 70% against B/L copyBalancedThe default for a first order with a supplier you have verified
30% / 70% against inspection passBuyerWhere quality risk is the main concern; the factory will usually ask for a slightly higher price
Letter of credit at sightBoth, at a costOrders large enough for the bank fees to be irrelevant; common in markets where T/T is restricted
100% before productionSeller onlyRarely justified for a new supplier, whatever the discount offered
Platform escrow or trade assuranceBuyer, partlySmall first orders where the platform's dispute process has real teeth

Structures are commercial, not regulated. What protects a buyer is the paperwork: a signed PI, a bank transfer to a company account matching the contracting entity, and inspection rights written into the order.

Three details are worth settling at the booth rather than by email afterwards. Whether the balance is due against a bill of lading copy or against arrival, because the first is standard and the second shifts demurrage risk to you. Whether the deposit is refundable if production slips beyond an agreed date. And what happens to the deposit if the inspection fails twice — rework, price reduction, or cancellation with partial refund.

Sample Fees and the Refund That Never Arrives

A sample fee of USD 50 with a promise to refund it against an order is a normal arrangement. What is not normal is discovering, three months later, that the refund was conditional on an order size nobody wrote down.

Two lines in an email fix it: the sample fee amount, and the order value or quantity at which it is credited. If a supplier will not commit to those two lines, treat the fee as a purchase rather than a deposit — and judge the sample on its own merits.

Where the sample is customised, expect to pay for tooling separately, and expect the tooling to be non-refundable. That is reasonable. What is worth confirming is that the tooling stays yours, and that a second sample round is included rather than charged again.

What a Usable Proforma Invoice Contains

The proforma invoice is the document the whole shipment is built on. It is quoted at the booth, signed by email a week later, and then read by a customs officer in another country. If it is thin, everything downstream is slow.

  • Full product description — material, construction, dimensions, colour, and model reference. Not "bag" but "600D polyester backpack, 45 × 30 × 15 cm, black, model BP-2045".
  • Packing details — units per inner box, units per export carton, carton dimensions and gross weight. This is what decides your freight cost, and it is routinely left out.
  • HS code — the one the factory would declare on export, which should be the same classification your broker uses at import.
  • Incoterms 2020 term and named place — written out, with the port or address.
  • Payment terms and dates — deposit due, balance due, and the production lead time counted from deposit receipt.
  • Inspection standard — AQL levels and who may inspect.
  • Supplier identity — company name as registered, address, and the bank account name, which must match.

An invoice missing the packing details or the HS code is an invoice that will be rewritten in a hurry in December, by someone who has forgotten what was agreed in October.

Four Requests That Should End the Conversation

  • "Pay to my personal account." A company that cannot receive money in its registered corporate name is a company whose recourse you do not have.
  • "100% in advance and we will give you 8% off." The discount is priced against the risk being transferred to you, and 8 percent is not the cost of that risk.
  • "We cannot put the HS code on the invoice." Every exporter declares a code. Refusal means the classification is a problem, and the problem will surface at your border.
  • "No inspection, our quality is guaranteed." A supplier confident in the goods has no reason to refuse a third-party check the buyer pays for.

None of these are automatic fraud. All of them are positions that remove your ability to enforce anything after the money leaves, and at a trade fair there are forty alternatives within a five-minute walk.

FAQ

Q What MOQ is normal for a first order from a Canton Fair supplier?

It varies by category, but per-order mixed MOQ is negotiable far more often than the quoted per-model figure suggests. Ask for the smallest run at a workable price and for the volume the next order would need to reach.

Q Is 30/70 payment standard in China?

Yes. Thirty percent deposit with the balance against a copy of the bill of lading is the ordinary structure. Alternatives include balance against inspection pass, letters of credit, and platform escrow for small orders.

Q Should I pay a deposit at the fair?

No. Sign a proforma invoice first, check that the bank account name matches the contracting company, and pay by bank transfer to a corporate account. Cash or personal transfers remove your ability to recover anything.

Q What must a proforma invoice include?

Product description with material and dimensions, packing details with carton dimensions and gross weight, HS code, Incoterms term with named place, payment terms, production lead time from deposit, and the inspection standard.

Q How do I know a supplier is a factory and not a trading company?

Ask for the business licence and compare the registered scope and address with where you are standing. A trading company is not automatically a problem, but you should know which one you are buying from, because it changes who controls quality and price.

Turn the agreement into a shipment that moves

Once the PI is signed, send it to us. We will check the packing data against the container or air capacity you are paying for, flag the document gaps, and quote the leg the supplier is not covering.

Email sales8015@goodhopefreight.com  |  WhatsApp & phone +86 133 9216 2503