Home Shipping from China to Montenegro LCL shipping cost from China to Montenegro in 2025
LCL shipping cost from China to Montenegro in 2025
LCL Ocean Freight from Shenzhen & Hong Kong to Podgorica, Montenegro | Shenzhen 145 USD/m³ (39 days via Koper), Hong Kong 182 USD/m³ (36 days via Koper), Min 1 m³ Demo
LCL sea freight from China to Podgorica, Montenegro. Shenzhen to Podgorica: 145 USD/m³, 39 days via Koper. Hong Kong to Podgorica: 182 USD/m³, 36 days via Koper. Volume range: 0-15 m³, minimum billable volume: 1 m³. Best rate from Shenzhen at 145 USD/m³.
| Port of destination | country | Volume range (m³) | Sea Freight (USD/m³) | Minimum billable volume | Transit port | Flight Range (Days) |
|---|---|---|---|---|---|---|
| Podgorica | Montenegro | 0~15 | 145 | 1 | Koper | 39 |
LCL sea freight from Shenzhen, China to Podgorica (Montenegro) is 145 USD per cubic meter, with a volume range of 0~15 m³, a minimum billable volume of 1 m³, transiting via Koper, and a total voyage of 29 days.
| Port of destination | country | Volume range (m³) | Sea Freight (USD/m³) | Minimum billable volume | Transit port | Flight Range (Days) |
|---|---|---|---|---|---|---|
| Podgorica | Montenegro | 0~15 | 182 | 1 | Koper | 36 |
LCL sea freight from Hong Kong, China to Podgorica (Montenegro) is 182 USD per cubic meter, with a volume range of 0~15 m³, a minimum billable volume of 1 m³, transiting via Koper, and a total voyage of 36 days.