Since 2012 NVOCC GD20230925153335 24h Response
+86 13392162503 sales8015@goodhopefreight.com Login
Goodhope Freight

Home / Logistics Knowledge / FCL Drayage and Inland Trucking: Factory to Port

FCL Drayage and Inland Trucking: Factory to Port

Moving the full container from your supplier to the port is the first physical leg. Getting pre-carriage right prevents missed sailings.

What drayage covers

Drayage is the trucking of the container between the inland point (your factory or warehouse) and the port container yard. It is the short-haul leg that connects your cargo to the vessel.

Pre-carriage versus on-carriage

Pre-carriage is the inland move before the ocean leg (factory to port). On-carriage is the inland move after the ocean leg (destination port to your warehouse). Both are separate from the sea freight.

Trucking options

Booking the truck

Arrange drayage with enough lead time and confirm the cut-off. Oversized or heavy boxes may need a special chassis or permits. Build buffer for traffic and any terminal congestion.

Costs and what is included

Drayage is priced per move and may include waiting time, chassis, and terminal fees. It is not part of the ocean freight, so confirm whether your quote includes it.

A missed cut-off because the truck was late rolls the whole container. Coordinate the truck, the stuffing, and the cut-off so the full box reaches the terminal on time.

What does this page cover?

The page explains the routing, the documents and the practical limits, so an importer can plan backwards from the delivery date. Anything that depends on a carrier or a customs decision is confirmed at booking. Tell us the commodity and the volume and the general advice becomes a specific quote.

What are the steps from booking to delivery?

The usual sequence is: quote and booking, cargo ready at the supplier, pickup or warehouse receiving, export declaration and loading, ocean or air leg, arrival notice, import clearance and release, then delivery or collection. Each step has a document or a payment that unlocks the next one. We confirm the sequence for your Incoterm so you know which steps are ours and which sit with the consignee.

Which documents should I prepare before the cargo leaves China?

The base set is a commercial invoice, a packing list, a bill of lading for sea freight or an air waybill for air freight, and a certificate of origin where the buyer or destination requires one. Food, plants, chemicals, pharmaceuticals and machinery commonly need extra certificates — health, phytosanitary, fumigation or product compliance. Import licences are issued in the destination country, so the consignee or their broker should confirm the current list before the cargo sails.

How far ahead should I book?

Two weeks before the desired sailing is a comfortable default for a simple FCL shipment, and earlier in peak season or when special equipment is needed. LCL depends on the consolidation schedule, and air freight on the flight and cutoff. Working backwards from the delivery date is the reliable way to set the booking date.

Frequently Asked Questions

Who arranges drayage?

It follows the Incoterms. Under FOB or CFR to the port, the seller usually arranges pre-carriage; under EXW the buyer handles everything.

Is drayage included in the ocean freight?

No, it is a separate local charge for the inland move.

How long does factory-to-port take?

Hours locally and a day or more for cross-country moves; allow buffer for traffic and terminal queues.

What if the truck misses the cut-off?

The container rolls to the next sailing, delaying delivery and possibly adding storage.

Need a freight quote from China?

Our team ships batteries, chemicals, and general cargo worldwide. Get a tailored rate within 24 hours.

Get A Quote

call us: +86 13392162503

Frequently asked questions

What does FCL Drayage and Inland Trucking: Factory to Port cover?
It sets out what the service includes, which cargo it suits and where the handover points sit, so a shipper can decide whether it fits the lane before asking for anything specific.
Where can I check details of FCL Drayage and Inland Trucking: Factory to Port?
The details sit on this page and in the references it links to, and anything that turns on a rate, a schedule or a permit is confirmed against the carrier or the customs authority rather than assumed from a summary.