The Port of Baltimore, formally the Helen Delich Bentley Port of Baltimore (UN/LOCODE: USBAL), sits in Baltimore, Maryland, along the Patapsco River, part of the Chesapeake Bay system, about 240 km from the Atlantic. The main channel is 50 feet deep, among the best depth conditions on the U.S. East Coast. Baltimore is also the largest ro-ro port in the United States, with auto and construction machinery imports among the highest nationally, while its container business centers on the Seagirt terminal. For cargo exported from China to the U.S. mid-Atlantic, Pennsylvania and the eastern Great Lakes, Baltimore is a common entry choice.
The Port of Baltimore sits on the Patapsco River, a northern arm of Chesapeake Bay, with the port area extending from the river mouth toward the city over several dozen kilometers. This position defines two features: entering from the Atlantic requires a long sail up the bay, and the port area reaches far inland, so the overland radius after discharge directly covers Maryland, Pennsylvania and the Ohio River valley.
Although the bay sail is long, the direct benefit of the 50-foot depth is the ability to berth the largest current ultra-large container ships. In August 2023, Evergreen's Ever Max, capable of loading 15,432 TEU, became the largest vessel to call at Baltimore at that time; in November 2025, Evergreen's Ever Model called again, capable of loading more than 15,000 TEU, the second largest in port history. The combination of deep channel and post-Panamax cranes is the basis for Baltimore's competitiveness among U.S. East Coast ports.
Baltimore's public terminals are managed by the Maryland Port Administration (MDOT MPA) of the Maryland Department of Transportation. The port authority operates public berths and grounds, handles marketing and facility investment, while specific terminal operations are run by terminal operators, of which Ports America Chesapeake operates the Seagirt terminal under a long-term lease.
| Port full name | Helen Delich Bentley Port of Baltimore |
| Managing body | Maryland Port Administration (MDOT MPA), Maryland Department of Transportation |
| Authority address | World Trade Center, 401 E. Pratt Street, Baltimore, MD 21202 |
| Authority phone | (410) 385-4444; toll-free 1-800-638-7519 |
| Official website | mpa.maryland.gov |
| International location code | USBAL (UN/LOCODE, used in bills of lading and booking systems) |
| Federal port code | 1303 (Baltimore, Maryland) |
When consignees need to consult on terminal operations, gate hours or charges, they should first confirm which terminal the cargo is at and then contact the corresponding terminal operator's customer service; the port authority does not handle per-shipment pickup and charges directly. For customs business, contact the CBP port office in Baltimore. The port authority also maintains overseas representative offices for the Midwest, New York and New Jersey, Pittsburgh, Detroit, Europe and Asia for freight market promotion; these do not handle daily operational business.
Baltimore's container business is distributed across two main terminals: Seagirt Marine Terminal handles the great majority of container throughput, while Dundalk Marine Terminal is a comprehensive terminal handling ro-ro, breakbulk and some containers.
| Terminal | Operator | Scale | Main facilities |
| Seagirt Marine Terminal | Ports America Chesapeake (50-year lease) | About 320 acres, 4 berths, of which berths 2 and 3.5 are 50 feet deep | 8 post-Panamax cranes, 22 rubber-tired gantries and 15 hybrid electric gantries, about 350 reefer plugs, design capacity about 1.5 million TEU per year |
| Dundalk Marine Terminal | MDOT MPA public terminal | About 570 acres, 13 berths, with depths of 34, 42 and 50 feet | 10 warehouses totaling about 790,000 square feet, 4 auto processing facilities, handling ro-ro, breakbulk and containers |
Seagirt is the main landing terminal for import FCL cargo; the great majority of China-to-Baltimore containers discharge here. The terminal's eight post-Panamax cranes can serve multiple large vessels at once, and the roughly 350 reefer plugs meet storage needs for fresh and pharmaceutical cargo. Dundalk is oriented more toward ro-ro and breakbulk, with autos, construction machinery and out-of-gauge cargo mostly handled there, and full auto processing facilities inside the terminal.
Both terminals are on the north side of the port area, connected to the city road network by the same set of access roads. Before pickup, confirm the actual landing terminal, because gate locations, appointment systems and operator customer service all differ. If one shipment discharges at both terminals, pickup must be arranged separately.
| Year | Seagirt container volume | Notes |
| 2023 | About 1.108 million TEU | A record at the time, with 673,555 lifts completed that year |
| 2024 | Noticeably lower | The Francis Scott Key Bridge collapsed on March 26, 2024; the main channel was closed for nearly three months and full-year volume fell |
| 2025 | 1,113,309 TEU | An all-time record, exceeding the 2023 record by more than 5,000 TEU and up more than 300,000 TEU on 2024 |
TEU (Twenty-foot Equivalent Unit) is the standard unit of container throughput, with one 40-foot container counted as 2 TEU. In 2025 the Seagirt terminal completed 677,572 lifts, averaging 40 per hour, with 689 vessel calls, both all-time records. Port-wide, public and private terminal cargo vessel calls reached 2,223 in 2025, exceeding 2023's 2,137, up 21% year on year; weekly container liner services rose from 12 in 2024 to 15, and higher service frequency is the direct cause of the volume recovery.
Beyond containers, Baltimore's ro-ro business is the largest in the United States. Import ro-ro cargo reached 887,513 tons in 2025, an all-time record; 728,225 autos and light trucks passed through the port for the year. The port is also the second largest U.S. importer of aluminum, gypsum, salt and sugar, and the second largest coal exporter, with 2025 coal exports of 26,355,309 tons worth more than USD 2.4 billion. The diversity of business mix gives Baltimore strong buffering capacity when a single cargo category fluctuates.
Baltimore is on the U.S. East Coast, and from China there are two main service forms: all-water via the Panama Canal, and minibridge with rail transfer after discharge at a West Coast port. The former is the traditional direct choice for the East Coast; the latter is usually faster but with a different cost structure.
Beyond service form, port call order matters. Vessels on the same service often call at New York-New Jersey, Savannah or Norfolk before Baltimore, with Baltimore generally later in the rotation. This means the ocean time to Baltimore on the same service is usually longer than to New York, but it also means vessel work volume at Baltimore is relatively concentrated, and discharge and pickup queuing pressure is often lower than at large hub ports. At booking, confirm the call order and estimated arrival date with the forwarder rather than looking only at the service name.
The table below gives port-to-port sailing time ranges from public industry data. Express refers to products with fewer port calls and tight schedules; standard refers to conventional schedules with more intermediate calls. Actual voyages are affected by vessel type, call order, Panama Canal transit conditions and weather.
| Origin port in China | Via Panama Canal (standard) | Via West Coast minibridge (incl. rail) |
| Shanghai (Yangshan) | About 30 to 36 days | Ocean about 11 to 18 days, plus rail about 7 to 9 days |
| Ningbo-Zhoushan | About 31 to 37 days | Ocean about 12 to 18 days, plus rail about 7 to 9 days |
| Shenzhen Yantian / Shekou | About 32 to 38 days | Ocean about 13 to 25 days, plus rail about 7 to 9 days |
| Qingdao | About 33 to 39 days | Ocean about 14 to 18 days, plus rail about 7 to 9 days |
The sailing time is only one segment of total lead time. What affects the consignee's wait is the sum of ocean leg, origin handling, destination discharge and pickup, U.S. customs release and inland delivery. Usually the following must be added: origin booking and loading plus export declaration, one to two days; one to three days from discharge to container availability after arrival; appointment pickup after clearance, which may wait a further three to seven days in peak season; and one to two days to return the empty after de-stuffing. One special note: Panama Canal routings see reduced daily lock transits when canal-area water levels are low, and some sailings are delayed three to five days. West Coast minibridge routings are unaffected by the canal but constrained by West Coast terminal congestion and rail car supply. Before booking, confirm both routes' current-month rates and estimated arrival dates with the forwarder, then decide against the delivery date.
Carriers calling at Baltimore are mainly global liner companies operating transpacific and transatlantic services, most sharing slots and terminal resources through alliances. Beyond rate, carrier choice must also consider call order, cut-off times, equipment supply and schedule reliability.
| Carrier | Alliance / operating mode | Features |
| MSC (Mediterranean Shipping Company) | Independent east-west operation | Global capacity scale near the top; complete all-water East Coast service products |
| Maersk | Gemini Cooperation | Complete global network; hub transshipment model shared with Hapag-Lloyd |
| Hapag-Lloyd | Gemini Cooperation | Operates jointly with Maersk; publicly reported schedule reliability leads the industry |
| CMA CGM | Ocean Alliance | Largest alliance scale, broad transpacific and transatlantic port coverage |
| COSCO Shipping | Ocean Alliance | Ample owned capacity; strong slot assurance on China-U.S. services |
| Evergreen Marine | Ocean Alliance | Multiple ultra-large vessels call at Baltimore; owner of the port's largest and second-largest calling vessels |
| OOCL | Ocean Alliance | Complete information systems with good schedule traceability |
| ONE (Ocean Network Express) | Premier Alliance | Stable Asia to U.S. East Coast network coverage |
| HMM | Premier Alliance | Korean carrier with stable transpacific capacity deployment |
| Yang Ming | Premier Alliance | Taiwan, China-based carrier participating in transpacific alliance operations |
| ZIM | Independent operation | Distinctive East Coast service products, with fewer terminal calls |
| Wan Hai | Independent operation | Mainly intra-Asia services, with recent expansion on U.S. East Coast services |
The alliance landscape was redrawn from February 2025: the Gemini Cooperation comprises Maersk and Hapag-Lloyd, with schedule reliability as its main feature; the Ocean Alliance comprises CMA CGM, COSCO, Evergreen and OOCL, the largest alliance scale and most port calls; the Premier Alliance comprises ONE, HMM and Yang Ming. Within the same alliance, different carriers still differ in calling terminal, cut-off times and equipment supply. At booking, provide origin, destination ZIP code and volume together, and let the forwarder compare rates horizontally and offer two or three options.
Terminal gates set the windows for trucks to enter and pick up containers. The Seagirt and Dundalk terminals do not share a uniform shift arrangement, generally divided into day shift and off-peak night shift; some terminals open Saturday, and most are closed Sunday.
| Terminal | Weekdays | Night shift | Weekends |
| Seagirt Marine Terminal | Day shift opens in the morning and closes in the afternoon; specific times per the terminal's daily notice | Off-peak windows arranged per terminal notice | Mostly open Saturday daytime; mostly closed Sunday |
| Dundalk Marine Terminal | Day shift opens in the morning and closes in the afternoon | Per cargo type and work arrangement | Per terminal notice |
Gate hours are adjusted daily according to vessel work and volume, with shifts added or removed on holidays; the table above is a pattern reference only and must not be treated as a fixed timetable. Before pickup, check the current day's gate calendar on the corresponding terminal operator's website — Ports America Chesapeake publishes gate hours for Seagirt, and MDOT MPA publishes work notices for the Dundalk public terminal.
Beyond gate hours, pickup must be booked in advance in the online system for an entry window (appointment). In peak season windows are tight and appointments often extend several days out, a main cause of demurrage. Import heavy containers are usually picked up on the day shift; reefer containers and cargo needing manual handover generally require separate appointments. Some terminals also require drivers to register vehicle and document information through a designated platform, and vehicles without completed registration cannot enter the gate; drayage carriers should complete account and qualification preparation in advance.
Baltimore's rail distribution is handled by two Class I railroads, CSX Transportation and Norfolk Southern Railway, both with facilities near the port area capable of taking FCL cargo loaded directly after discharge.
| Rail facility | Railroad | Location | Contact |
| Seagirt Container Transfer Facility (ICTF) | CSX Transportation | Immediately adjacent to Seagirt terminal, about 1,000 feet away | Per carrier-published information |
| Baltimore (Bayview) facility | Norfolk Southern Railway | 4800 East Lombard Street, Baltimore, MD 21224 | 410-558-1529 / 1530 / 1531 |
CSX's container transfer facility sits right next to Seagirt terminal, with a short distance between them; containers can be drayed directly from the terminal into the rail facility for loading, reducing long-distance haulage and one ground handover. Norfolk Southern's Baltimore facility is on the east side of the port area and can run block trains toward Pennsylvania, Ohio and the Midwest.
A historical factor constraining Baltimore's rail distribution capacity is a rail tunnel through the city. CSX's Howard Street Tunnel, built about 130 years ago, has insufficient clearance for double-stack container trains, so container block trains out of Baltimore can only be single-stack, limiting both capacity and cost. The tunnel's reconstruction project, an investment of USD 518 million, is planned for completion in 2026, after which double-stack container trains can run, expected to bring the port about 160,000 additional containers per year. This upgrade will directly improve Baltimore's competitiveness for inland rail distribution; consignees in Pennsylvania, Ohio or the eastern Great Lakes can watch for new block train options once the line opens.
Customs business in Baltimore is handled by U.S. Customs and Border Protection (CBP) at port 1303. As a major East Coast seaport, formal entry filing, examination and release are available, with examination facilities for ro-ro, breakbulk and containers.
Formal entry filing requires the consignee's employer identification number (EIN), commercial invoice, packing list and bill of lading. Ocean cargo must complete the Importer Security Filing (ISF, commonly called 10+2) before loading, submitted by the importer or its agent at least 24 hours before the vessel sails. Commodity classification, origin and valuation are handled under the Harmonized Tariff Schedule of the United States (HTSUS); categories subject to additional duties must be checked separately. Maryland levies no state personal income tax; goods entering circulation in the state for final consumption may involve sales and use tax, handled by the consignee according to its business nature and registration.
After containers discharge at Seagirt or Dundalk, clearance, payment, appointment and pickup must all be completed before leaving the port. Each step can produce waiting; preparing documents and accounts in advance is key to compressing time.
The steps most likely to go wrong are the second and the fourth. Incomplete entry documents delay release while storage and per-diem keep running; when the appointment system has no slots released, a truck on site can only wait. It is recommended to submit invoice, packing list and bill of lading to the broker for pre-review a week before the vessel's estimated arrival, and to check release status in the system immediately after the arrival notice, locking an appointment window as soon as release is granted. Reefer containers, out-of-gauge cargo and cargo requiring examination need separate arrangement, with pickup usually taking longer than ordinary heavy containers.
The Last Free Day (LFD) is the date the free storage period ends; after that day, storage charges begin. Baltimore's terminals have different free periods, usually specified separately for standard and reefer containers, and excluding detention time for cargo requiring examination.
| Item | Start of count | Free period | Billing party |
| Terminal storage | The discharge date or the date the container is available | Per terminal announcements, specified separately for standard and reefer containers | Terminal operator |
| Carrier container per-diem | The day the container leaves the terminal | Free time by container type and service | Ocean carrier |
| Chassis rental | The day the chassis is actually picked up | As agreed with the drayage carrier | Chassis provider |
The three charges belong to the terminal operator, the ocean carrier and the chassis provider respectively, with different counting bases that do not offset one another. Terminal storage overrun does not automatically extend the carrier's free time, and vice versa. After receiving the arrival notice, the consignee should check three things together: the terminal's last free day, the carrier's free-time expiry, and the return point's location and hours. Confirm all three before setting pickup and return dates to avoid clearing one while overrunning another.
If pickup cannot be completed within the free period for reasons beyond the consignee's control — such as a customs hold or document correction — a written extension request can be filed with the terminal or carrier, supported by the relevant documents, and must be submitted before the original expiry date; late requests are generally not backdated. Whether it is granted depends on each company's published policy, and there is no uniform standard. Reefer containers additionally require confirming the terminal's billing method for plugging and temperature records, with overdue charges usually higher than for standard containers.
Customs examination (CBP Examination) is a routine part of the import process, sampling declared cargo by risk score. The examination is usually completed at the terminal where the container lands, and can also take place at an inland port after transfer, depending on the examination location set at filing.
| Exam type | What is done | Effect on pickup |
| Document review | Checks invoice, packing list, certificate of origin against the filing | Does not move cargo; released once documents are supplied |
| X-ray scan (VACIS / NII) | Full-container imaging without opening | Usually same-day; container stays in the yard |
| Tailgate exam | Opens the door to check the front cargo | Adds half a day to a day |
| Intensive exam (CET) | Moved to the exam area for piece count and de-stuffing | Adds three to seven days; must be re-stuffed |
Examination produces several charges: the exam service fee, drayage round-trip, labor for de-stuffing and re-stuffing, and storage during the exam. These are borne by the consignee regardless of the outcome. The container can be picked up only after release, so examination is a main source of pickup-time fluctuation. Practical ways to lower the chance of being flagged are: match the declared description to the actual goods, keep the price within the common range for similar goods, avoid under-declaration and mixed loading, and maintain a continuous import record. Importers with frequent filing anomalies are more easily marked by the system.
When goods cannot clear U.S. customs or the consignee refuses delivery, a return shipment can be arranged, provided the goods have not been consumed or delivered in the United States and remain in a terminal, bonded warehouse or customs-controlled area. Goods already released, delivered to the consignee's warehouse and entered into domestic circulation cannot be treated as a return.
Whether to return is usually decided after comparing three alternatives: abandoning the goods, reselling to another country, or destroying on site. Abandonment requires a customs application and bears the destruction cost; resale requires re-arranging transport and export procedures. For goods subject to additional duties or requiring permits, confirm the destination country's import requirements before disposal to avoid being blocked a second time.
As a U.S. port, Baltimore's terminals generally stop container gate operations on federal legal holidays, the customs port office rests the same day, and most terminals and brokers do not work. Some terminals arrange weekend or holiday overtime gates in peak season, per terminal notice. The United States has 11 federal legal holidays in 2026:
| Date | Day | Holiday |
| January 1 | Thursday | New Year's Day |
| January 19 | Monday | Martin Luther King Jr. Day |
| February 16 | Monday | Presidents' Day |
| May 25 | Monday | Memorial Day |
| June 19 | Friday | Juneteenth |
| July 3 | Friday | Independence Day (July 4 falls on a Saturday, observed Friday) |
| September 7 | Monday | Labor Day |
| October 12 | Monday | Columbus Day |
| November 11 | Wednesday | Veterans Day |
| November 26 | Thursday | Thanksgiving Day |
| December 25 | Friday | Christmas Day |
U.S. holiday arrangements and Chinese export rhythm affect each other. Around Chinese New Year and the October Golden Week, Chinese factories close and shipments concentrate, with carriers canceling some sailings (blank sailings) around the holidays, tightening space and schedules; the U.S. Thanksgiving and Christmas holidays coincide with the year-end restocking peak, with delivery and pickup slowing in the surrounding week. Including both ends' holidays in scheduling reduces delays.
China-U.S. ocean shipping is clearly seasonal, with rates, space and terminal congestion fluctuating by month, broadly around the U.S. retail stocking rhythm and Chinese long holidays.
| Period | Status | Notes |
| January to March | Off-peak | Post-Chinese New Year demand trough, lowest annual rates, relatively ample space and equipment |
| January to February (pre-CNY) | Small peak | Concentrated shipment before factory closures, short-term tight space |
| April to May | Shoulder season | Rates at lows with stable transit times, suited to routine restocking |
| June to July | Small peak | E-commerce promotion stocking begins, rates start rising |
| August to October | Annual highest peak | Year-end holiday stocking ships concentrated, tightest space and appointments |
| November to December | Falling | Christmas stocking ends, volumes fall and rates retreat |
For Baltimore, peak season adds two variables. First is Panama Canal transit conditions: when canal-area water levels are low, daily lock transits fall and all-water routings may be delayed three to five days. Second is U.S. East Coast weather: winter snowstorms on the East Coast can delay vessel berthing and temporarily close terminal gates. For consignees with strict delivery requirements, it is recommended to keep quotes and space contingency for both the Panama Canal and West Coast minibridge routings in peak season, and to confirm at booking how the carrier handles canal delays.
Among U.S. East Coast ports, Baltimore's characteristics are deep channel, close hinterland and broad cargo mix. As an entry port, its advantages concentrate in the following areas.
| Advantage | What it means |
| 50-foot channel depth | Fort McHenry Federal Channel at 50 feet, among the best depth conditions on the U.S. East Coast, can berth ultra-large container ships directly; the port's largest calling vessel exceeds 15,000 TEU |
| Deep-inland overland radius | The port area sits at the northern end of Chesapeake Bay, west via I-70 direct to Pennsylvania and Ohio, north via I-95 covering Philadelphia and the New York metro; inland distances after discharge are shorter than coastal ports |
| Largest ro-ro port nationally | The largest U.S. ro-ro throughput port, with 728,225 autos and light trucks in 2025 and a complete post-landing handling chain, suited to vehicle and construction machinery cargo |
| Two selectable rail facilities | CSX's container transfer facility adjoins Seagirt terminal, and Norfolk Southern's facility is on the east side of the port area, enabling Midwest distribution |
| Double-stack block trains from 2026 | After the Howard Street Tunnel reconstruction completes, double-stack container trains can run, expected to add about 160,000 containers per year, markedly improving inland rail distribution capacity |
| Diverse cargo mix | Beyond containers and ro-ro, among the national leaders in imports of aluminum, gypsum, salt and sugar and coal exports, giving strong risk resistance when a single cargo category fluctuates |
| Rising service frequency | Weekly container liner services rose from 12 in 2024 to 15 in 2025; 2025 cargo vessel calls of 2,223 set a record |
The limits should also be seen. Vessels entering from the Atlantic must sail about 240 km along Chesapeake Bay, so ocean time is longer than ports directly on the open sea; Baltimore sits later in the call order on most Asia to U.S. East Coast services, so all-water ocean time to China is usually longer than to New York-New Jersey. Until the Howard Street Tunnel reconstruction completes in 2026, container block trains out of Baltimore can only be single-stack, and the rail distribution cost advantage is not yet fully released. The port area's surroundings are old industrial districts with uneven road conditions and warehouse facilities; when selecting a warehouse location, confirm the access road's height and weight limits. Baltimore suits best: receiving markets concentrated in Maryland, Pennsylvania, Ohio and the Washington, D.C. area, or cargo that is itself ro-ro-type goods such as vehicles and construction machinery.
Seagirt Marine Terminal handles the great majority of Baltimore's container throughput, operated by Ports America Chesapeake under a long-term lease. Dundalk Marine Terminal is a comprehensive terminal also handling ro-ro, breakbulk and some containers.
The main channel is Fort McHenry Federal Channel, 50 feet deep, about 15.2 meters, among the best depth conditions on the U.S. East Coast, able to berth ultra-large container ships directly.
On the all-water routing via the Panama Canal, ocean time is about 30 to 36 days from Shanghai or Ningbo and about 32 to 38 days from Shenzhen. On the West Coast minibridge routing, the ocean leg is about 11 to 25 days plus rail of about 7 to 9 days. Both routes must add origin and post-arrival handling time.
The Seagirt terminal completed 1,113,309 TEU in 2025, an all-time record, exceeding the 2023 record by more than 5,000 TEU and up more than 300,000 TEU on 2024. The year saw 677,572 lifts, averaging 40 per hour.
Baltimore is the largest U.S. ro-ro throughput port. Import ro-ro cargo reached 887,513 tons in 2025, an all-time record, with 728,225 autos and light trucks through the port for the year, and dedicated auto processing facilities on site.
Two Class I railroads: CSX Transportation and Norfolk Southern Railway. CSX's container transfer facility adjoins Seagirt terminal, and Norfolk Southern's Baltimore facility is on East Lombard Street, able to run block trains toward the Midwest.
The tunnel's insufficient clearance previously limited container block trains out of Baltimore to single-stack. The reconstruction, an investment of USD 518 million, is planned for completion in 2026, after which double-stack container trains can run, expected to bring the port about 160,000 additional containers per year.
Yes. Pickup must be booked in advance in the terminal's or carrier's appointment system for an entry window; in peak season windows are tight and appointments often extend several days out, a main cause of demurrage. Seagirt and Dundalk belong to different operating systems and require separate appointments.
An extension can be requested. For containers that cannot be picked up within the free period due to customs hold or similar, a written extension request can be filed with the terminal or carrier with the hold documents; materials must be submitted before the last free day, and late submissions are generally not backdated. Whether it is granted depends on each company's published policy.
Yes. Cargo without a final sales arrangement can be stored in a bonded warehouse, deferring duties and taxes until the cargo actually leaves the warehouse into domestic circulation. Before use, confirm the warehouse's customs qualification and scope of operations with the broker.
The channel has recovered. After the Francis Scott Key Bridge collapsed on March 26, 2024, the main channel was closed and Fort McHenry Federal Channel reopened to navigation on June 10, 2024. Baltimore's 2025 container volume and vessel calls both hit record highs, and operations are back on a normal track.
Yes, provided the goods have not been consumed or delivered in the United States and remain in a terminal, bonded warehouse or customs-controlled area. A return requires U.S. export declaration and Chinese import declaration; goods returned in original condition due to quality or specification issues can apply for exemption from Chinese import duty and import taxes within the allowed period, with supporting documents such as the original export declaration.
Shipping from China to USA
Planning a shipment or just comparing options? Contact our freight experts to get a tailored rate within 24 hours.